Form I-EEDU, P/N 150492 R6, Page 31
FIGURE 29 - Discharge
Air End of the Heat
Exchanger showing the
Bafe Assembly to be
Removed
Conversion is complete for Sizes 75-100; skip to Step 4.
3. Sizes 125-400 only - Remove the Side Finger Bafes – Refer to FIGURE
30 showing the entering air side of the heat exchanger (bafes shown
in FIGURE 29 have already been removed). Identify the side nger bafes.
Remove both side bafes; each bafe is attached with two screws.
Remove the support
bracket screws and slide
the bafe assembly out
of the heat exchanger.
Replace the screws to
plug the holes.
Bafes (Remove
with the supports
as an assembly.)
Conversion is complete for Sizes 125-400; continue to Step 4.
4. Select a location adjacent to the rating plate for the conversion label. Being sure
the surface is clean and dry, adhere the conversion label that was completed in
Step 1.
Test for proper operation. Be sure to comply with the air throughputs in the table on
page 30.
FIGURE 30 - Entering
Air End of the Heat
Exchanger showing the
Side Finger Bafes to
be Removed
Remove the two
screws from each
of the side nger
bafes. Remove both
bafes.
Heat exchanger side
nger bafes being
removed (Sizes 125-
400).
NOTE: Do NOT remove
these side nger bafes
on Size 75 and 100.