Reznor VPS Unit Installation Manual Uživatelský manuál Strana 1

Procházejte online nebo si stáhněte Uživatelský manuál pro Radiátory Reznor VPS Unit Installation Manual. Reznor VPS Unit Installation Manual User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 44
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
Model VPS
Burner/Control Box
with 20 - 80 ft Tube/Reflector Length
INSTALLATION / OPERATION / MAINTENANCE
Applies to: Model VPS 120V 60Hz
Gas-Fired, Tubular, Radiant,
Low-Intensity Infrared Heater
Part No. 270683
Zobrazit stránku 0
1 2 3 4 5 6 ... 43 44

Shrnutí obsahu

Strany 1 - Part No. 270683

Model VPS Burner/Control Box with 20 - 80 ft Tube/Reflector Length INSTALLATION / OPERATION / MAINTENANCE Applies to: Model VPS 120V 60Hz Gas-Fir

Strany 2 - Introduction

10 1.6 Vent Requirements and Details 1.6.1 Unvented units Heaters may be installed without a vent providing the governing building co

Strany 3 - WARNING:

11 Figure 7.b Horizontal Venting. Figure 7.c Fresh Air Ducted Intake. Figure 7.d Wall Terminal Intake Kit. NOTE: The vent terminal should be instal

Strany 4

12 1.8 Technical Details - Table 5 No of Inje

Strany 5

13 USA & CANADA Natural Gas 0- 2000 ft (0

Strany 6

14 Options * Not available on LP Gas 1 All standard units fitted with unvented vent, natural gas and aluminized steel reflectors. 2 1 off 180° bend

Strany 7 - 3/4” CE4

15 2. Assembly Instructions. 2.2.3 Brackets There can be fo

Strany 8 - 24V Thermostat

16 2.2.4 Couplers The couplers are used for joining radiant tubes and U or L bends. Slide the coupler over the tube ensuring that the screw st

Strany 9 - Gas Valve

Typical usage of optional bend kits: 2.2.9 Detailed Assembly Drawings The following pages show the technical dimensional details of th

Strany 10 - 1.7 Fresh Air Intake

18 S20 S30 S40 S50 S60 S70 S80 U20 U4

Strany 11 - Figure 7.a Vertical Venting

19 Figure 9. Heater Assembly: Model Linear 60-S20 and 80-S20. G6"-9" REFLECTOR OVERLAPFGHCOUPLERBURNERENDCAPS(OPTIONAL)10' 3" R

Strany 12

Introduction. Document Index. 1 Installation Requirements 1.1 Health & Safety 1.2 Heater Suspension 1.3 Clearance to Combustibles 1.4 Gas Conne

Strany 13 - Technical Details continued

20 Figure 10. Heater Assembly: Model Linear 60-S30, 80-S30 and 100-S30. G6" REFLECTOR OVERLAP6" REFLECTOR OVERLAPFG GHS FCOUPLERBURNEREND

Strany 14

21 Figure 11. Heater Assembly: Model Linear 60-S40, 80-S40, 100-S40, 125-S40 and 150-S40. GFG GHS SCOUPLER*(HIGH TEMP COUPLERMODEL 125/150 )BURNERE

Strany 15 - 2. Assembly Instructions

22 Figure 12. Heater Assembly: Model Linear 100-S50, 125-S50, 150-S50, 170-S50, and 200-S50 GFGGHS FCOUPLER* (HIGH TEMPCOUPLERMODELS 125,150, 170 &

Strany 16

23 Figure 13. Heater Assembly: Model Linear 125-S60, 150-S60, 170-S60 and 200-S60 DETAILSLIDING REFLECTOR BRACKETDETAILFIXED REFLECTOR BRACKETREFLEC

Strany 17 - REFLECTORS

24 Figure 14. Heater Assembly: Model Linear 150-S70, 170-S70 and 200-S70. DETAILSLIDING REFLECTOR BRACKETDETAILFIXED REFLECTOR BRACKETREFLECTORTUBE

Strany 18

25 Figure 15. Heater Assembly: Model Linear 170-S80 and 200-S80 DETAILSLIDING REFLECTOR BRACKETDETAILFIXED REFLECTOR BRACKETREFLECTORTUBESTRAPRADIAN

Strany 19 - 2" MINIMUM

26 Figure 16. Heater Assembly: Model U tube 60-U20 and 80-U20. FCOUPLERBURNERENDCAPS(OPTIONAL)6"4"10' 3" REFLECTORS TYPICAL OF

Strany 20

27 Figure 17. Heater Assembly: Model U tube 60-U40, 80-U40, 100-U40, 125-U40 and 150-U40. 6"-9" REFLECTOR OVERLAPSFCOUPLER*(HIGH TEMPCOUP

Strany 21 - VIEW ON "A"

28 Figure 18. Heater Assembly: Model U tube 125-U60, 150-U60, 170-U60 and 200-U60 6"-9" REFLECTOR OVERLAPSFHT COUPLERBURNERENDCAPS(OPTION

Strany 22

29 Figure 19. Heater Assembly: Model U tube 170-U80 and 200-U80 F HT COUPLERBURNERENDCAPS(OPTIONAL)6"4"10' 3" REFLECTORS TYPICAL

Strany 23

3 accordance with the Standard for Parking Structures, ANSI/NFPA 88A, or the Standard for Repair Garages, ANSI/NFPA 88B, or the Can

Strany 24

30 3. Start Up Instructions. These appliances should be commissioned by a qualified mechanical contractor. 3.1 Tools Required. The following tool

Strany 25

31 Start the heater and using a suitable screwdriver adjust the pressure regulator, turning the screw clockwise to increase

Strany 26 - 3' 3"

32 Check installation has been carried out to these instructions. NO YES Ensure gas and electricity supplies are isolated. Disconnect gas hose from b

Strany 27

Small Flat Head Screwdriver 4. Servicing Instructions. These appliances should be serviced annually by a competent person to ensure safe and effic

Strany 28

34 4.3 Burner Removal Step 1: Isolate power and gas supplies. Step 2: Unplug the power connectors. Step 3: Detach the gas supply as shown

Strany 29

35 Step 3: Reconnect ignition leads, ground lead and silicone tube to test nipple. Refit gasket and support casting. 4.5 Burner Head and El

Strany 30 - 3. Start Up Instructions

36 Step 2: Remove fan retaining screws and unplug from burner box. Step 3: The combustion fan can now be detached. Step 4: Remov

Strany 31

37 5. Spare Parts. Required Spares In order to aid troubleshooting and servicing we recommend that the components shown in this section should be st

Strany 32

38 6. Troubleshooting Guide. STARTEnsure gas & electricity supplies are enabled. Turn any external timer to call for heat (if fitted).Does the P

Strany 33 - 4. Servicing Instructions

39 Do the amber lights remain illuminated af

Strany 34

4 1.3 Clearance to Combustibles. Minimum clearance to combustibles are shown in Table 1 below. IMPORTANT: The stated clearance to combustibles

Strany 35

7. Replacing Parts. 7.1 Burner Controller Replacement Step 1: Loosen screw in right hand burner access door and open. Step 2: Disconnec

Strany 36

41 7.3 Gas Valve Replacement Step 1: Remove the burner assembly as described in the servicing section. Step 2: Open the right hand

Strany 37 - 5. Spare Parts

42 MODEL Natural Gas Altitude Conversion Kit P

Strany 39

8.1 To Start the Heater 1. First ensure that the gas supply to each heater is turned on by opening the main gas shut off valve. 2.

Strany 40 - 7. Replacing Parts

C2C1AB1BBAED2.D1Ensure that there is adequateprovision in the building forcombustion and ventilation air supply.Installation must meet minimumrequirem

Strany 41

6 1.4 Gas Connection and Supply The gas connection on the heater is ½” N.P.T internal thread. Injector sizes and manifold pressure for

Strany 42 - 7.4 Optional Extra Kits

77 1.5 Electrical Connections This appliance must be electrically grounded Supply 120V 60Hz single phase. Standard heater 0.16HP. Current rating 1.2

Strany 43

8 Figure 5a. Single and Multiple Heater Insta

Strany 44

9 Figure 6. Internal Burner Wiring Diagram. If any of the original wire as supplied with the appliance must be replaced, it must be replaced with wir

Komentáře k této Příručce

Žádné komentáře